CAGE 8X691 - SIERRA NEVADA CORPORATION
USA

SIERRA NEVADA CORPORATION

CAGE Code: 8X691
DUNS: 094373495
444 SALOMON CIR
SPARKS NV 89434-9651
UNITED STATES

Telephone: 7753310222
Fax: 7752010078

SIERRA NEVADA CORPORATION is an Active Manufacturer with the Cage Code 8X691 and is tracked by Dun & Bradstreet under DUNS Number 094373495.

Additional Data For CAGE 8X691

SIC Code 1:3577
Status:A
Type:A
Size:E
Primary Business:J
Type of Business:N
Woman Owned:Y
CAO:S0507A
ADP CNT CT:HQ0339

USA Government Contracting Activity for 8X691

Wednesday, December 20, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
THE CONTRACTOR SHALL UPDATE NASA DESIGNED SYSTEMS APPROVED BY THE PROJECT MANAGER THROUGH THE REQUEST FOR INFORMATION (RFI) PROCESS FOR THE ADVANCED PLANT HABITAT SUBSYSTEMS (2.0) IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001. 2.0 REQUEST FOR INFORMATION (RFI) SUPPORT THE CONTRACTOR SHALL UPDATE THE NASA DESIGNS PER THE APPROVED DIRECTION GIVEN BY THE PROJECT MANAGER THROUGH THE REQUEST FOR INFORMATION (RFI) PROCESS. THE RFIS ARE 327, 329, 334, 338, 343, 345, 348, 349, 351, 352, 353, 354, 355, 356, 357, 358, 360, 361, 362, 363, 365, 366, 367, 368, 370, 371, 372, 373, 374, 375, 377, 379, 380, 381, 382, 383, 384, 386, 387, 388, 389, 390, AND 392. 3.0 DELIVERABLES/MILESTONE SCHEDULE 1.) SUBJECT TO OTHER LIMITATIONS AND CONDITIONS SPECIFIED IN THIS CONTRACT, MILESTONE PAYMENTS SHALL BE MADE TO THE CONTRACTOR UPON DELIVERY AND ACCEPTANCE OF THE MILESTONE EVENTS DESCRIBED IN THE BELOW TABLE. 2.) THE CONTRACTOR SHALL NOT BE ENTITLED TO PAYMENT OF A REQUEST FOR MILESTONES PAYMENT PRIOR TO SUCCESSFUL ACCOMPLISHMENT AND ACCEPTANCE BY THE GOVERNMENT OF THE MILESTONE EVENT. THE CONTRACTING OFFICER SHALL DETERMINE WHETHER THE MILESTONE EVENT OR PERFORMANCE CRITERION FOR WHICH PAYMENT IS REQUESTED HAS BEEN SUCCESSFULLY ACCOMPLISHED AND ACCEPTED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS OF THE CONTRACT. THE CONTRACTING OFFICER MAY, AT ANY TIME, REQUIRE THE CONTRACTOR TO SUBSTANTIATE THE SUCCESSFUL PERFORMANCE OF ANY EVENT OR PERFORMANCE CRITERION WHICH HAS BEEN OR IS REPRESENTED AS BEING PAYABLE. THE CONTRACTOR SHALL UPDATE NASA DESIGNED SYSTEMS APPROVED BY THE PROJECT MANAGER THROUGH THE REQUEST FOR INFORMATION (RFI) PROCESS FOR THE ADVANCED PLANT HABITAT SUBSYSTEMS (2.0) IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001. PERIOD OF PERFORMANCE: ISSUANCE OF TASK ORDER THROUGH JULY 30, 2017. 2.0 REQUEST FOR INFORMATION (RFI) SUPPORT THE CONTRACTOR SHALL UPDATE THE NASA DESIGNS PER THE APPROVED DIRECTION GIVEN BY THE PROJECT MANAGER THROUGH THE REQUEST FOR INFORMATION (RFI) PROCESS. THE RFIS ARE 327, 329, 334, 338, 343, 345, 348, 349, 351, 352, 353, 354, 355, 356, 357, 358, 360, 361, 362, 363, 365, 366, 367, 368, 370, 371, 372, 373, 374, 375, 377, 379, 380, 381, 382, 383, 384, 386, 387, 388, 389, 390, AND 392. MOD 1: THE PURPOSE OF MODIFICATION P00001 TO TASK ORDER 6 80KSC017F0068 IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 30 SEP 2017 TO 28 FEB 2018. ALL OTHER TERMS AND CONDITIONS OF 80KSC017F0068 REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  80KSC017F0068     NNK15MA02B  
Friday, December 15, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
ADVANCED PLANT HABITAT (APH) TASK ORDER 7 HARDWARE FOR FLIGHT AND ENGINEERING DEVELOPMENT UNIT (EDU) AND FLIGHT SUPPORT EQUIPMENT 1.0 INTRODUCTION THE CONTRACTOR SHALL PROVIDE CARBON DIOXIDE (CO2) BOTTLES (2.6), ENVIRONMENTAL CONTROL SUBSYSTEM INLET AND OUTLET FILTERS (2.7), ETHYLENE SCRUBBER (2.7.1), CARBON DIOXIDE SCRUBBER (2.7.1), AND SCIENCE CARRIER (2.8) FLIGHT HARDWARE TO SUPPORT THE MAINTENANCE OF BOTH FLIGHT UNITS AFTER THE FIRST USE ON ISS AND ON THE GROUND WHICH IS A PRE-OPERATION TO THE START OF THE FIRST SCIENCE EXPERIMENT (PH-01). THE ITEMS PROVIDED FOR THE ADVANCED PLANT HABITAT FLIGHT AND EDU HARDWARE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001. PERIOD OF PERFORMANCE: ISSUANCE OF TASK ORDER THROUGH OCTOBER 31, 2017. 2.0 HARDWARE AND FLIGHT SUPPORT EQUIPMENT THE CONTRACTOR SHALL PROVIDE FLIGHT READY HARDWARE CONSISTING OF: 2 CO2 BOTTLES, 2 ECS INLET AND 2 OUTLET FILTERS (TOTAL FOR 2 ECS MODULES), 1 ETHYLENE SCRUBBER, 1 CARBON DIOXIDE SCRUBBER, AND 2 SCIENCE CARRIER ROOT TRAYS WITH 2 SPARE OXYGEN SENSORS PER TRAY. (NOTE: THE OXYGEN SENSORS SHOULD BE TESTED BY THE CONTRACTOR PRIOR TO ACCEPTING THEM FROM THE VENDOR. ALSO, THE CONTRACTOR MUST USE EXTREME CAUTION WHILE HANDLING THE SENSORS DURING ASSEMBLY AND TEST.) 3.0 DELIVERABLES/MILESTONE SCHEDULE 1.) SUBJECT TO OTHER LIMITATIONS AND CONDITIONS SPECIFIED IN THIS CONTRACT, MILESTONE PAYMENTS SHALL BE MADE TO THE CONTRACTOR UPON DELIVERY AND ACCEPTANCE OF THE MILESTONE EVENTS DESCRIBED IN THE BELOW TABLE. 2.) THE CONTRACTOR SHALL NOT BE ENTITLED TO PAYMENT OF A REQUEST FOR MILESTONE PAYMENT PRIOR TO SUCCESSFUL ACCOMPLISHMENT AND ACCEPTANCE BY THE GOVERNMENT OF THE MILESTONE EVENT. THE CONTRACTING OFFICER SHALL DETERMINE WHETHER THE MILESTONE EVENT OR PERFORMANCE CRITERION FOR WHICH PAYMENT IS REQUESTED HAS BEEN SUCCESSFULLY ACCOMPLISHED AND ACCEPTED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS OF THE CONTRACT. THE CONTRACTING OFFICER MAY, AT ANY TIME, REQUIRE THE CONTRACTOR TO SUBSTANTIATE THE SUCCESSFUL PERFORMANCE OF ANY EVENT OR PERFORMANCE CRITERION WHICH HAS BEEN OR IS REPRESENTED AS BEING PAYABLE
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  80KSC017F0138     NNK15MA02B  
Wednesday, December 13, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 3 FOR ADVANCED PLANT HABITAT. 1.0 THE CONTRACTOR SHALL TEST (6.0) FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF ORUS FOR ALL APH SUBSYSTEMS WHICH INCLUDE THE AVIONICS (2.1), SOFTWARE (2.2), GROWTH LIGHT ASSEMBLY (GLA) (2.3), POWER DISTRIBUTION ASSEMBLY (PDA) (2.4), THERMAL CONTROL SYSTEM (TCS) (2.5), WATER RECOVERY AND DISTRIBUTION SYSTEM (WRADS) (2.6), ENVIRONMENTAL CONTROL SYSTEM (ECS) (2.7), SCIENCE CARRIER (2.8), GROWTH CHAMBER COMPONENTS (2.9), AND STRUCTURAL MOUNTING ASSEMBLY (SMA) (2.10) IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001 AND INTERFACE CONTROL DOCUMENT (ICD) SSP-53145. THE CONTRACTOR SHALL LEAD AND DEVELOP CREW TRAINING VIDEO AND SUPPORT THE DEVELOP CREW PROCEDURES FOR FLIGHT. THE CONTRACTOR SHALL LEAD THE PHASE 3 SAFETY DATA PACKAGE (5.2) EFFORTS FOR ALL APH SUBSYSTEMS. THE CONTRACTOR SHALL PROVIDE A MATERIAL INSPECTION AND RECEIVING REPORT (FORM DD250) FOR FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF ORUS AT THE KENNEDY SPACE CENTER. 2.0 FLIGHT HARDWARE TESTING 2.1 PRE-PROTO-FLIGHT TESTING THE CONTRACTOR SHALL PERFORM A CO2 INJECTION TEST AND CO2 CARTRIDGE VIBE TEST ON THE ENGINEERING DEVELOPMENT UNIT (EDU) PRIOR TO PROTO-FLIGHT TESTING (ECS (2.7)). 2.2 PROTO-FLIGHT TESTING THE CONTRACTOR SHALL DEVELOP PROTO-FLIGHT TEST PROCEDURES AND PERFORM PROTO-FLIGHT TESTING ON FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF FLIGHT ORUS WHICH INCLUDES THE AVIONICS (2.1), SOFTWARE (2.2), GLA (2.3), PDA (2.4), TCS (2.5), WRADS (2.6), ECS (2.7), SCIENCE CARRIER (2.8), GROWTH CHAMBER COMPONENTS (2.9), AND SMA (2.10). THE CONTRACTOR SHALL SUBMIT THE FINAL PROTO-FLIGHT TEST PROCEDURES TO THE CONTRACTING OFFICE FOR APPROVAL AND CONCURRENCE PRIOR TO STARTING THE PROTO-FLIGHT TESTING. THE PROTO-FLIGHT TESTING CONSISTS OF AN ELECTROMAGNETIC TEST (EMI), VIBRATION TESTING, ACOUSTICS TESTING, OFF GAS TESTING, AND PAYLOAD RACK CHECKOUT UNIT TESTING (PRCU). 2.3 ACCEPTANCE TESTING THE CONTRACTOR SHALL DEVELOP ACCEPTANCE TEST PROCEDURES AND PERFORM ACCEPTANCE TESTING ON FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF FLIGHT ORUS WHICH INCLUDES THE AVIONICS (2.1), SOFTWARE (2.2), GLA (2.3), PDA (2.4), TCS (2.5), WRADS (2.6), ECS (2.7), SCIENCE CARRIER (2.8), GROWTH CHAMBER COMPONENTS (2.9), AND SMA (2.10) MOD 6: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR MILESTONE #11 FROM 11/3017 TO 1/31/18 AT NO ADDITIONAL COST TO THE GOVERNMENT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK16MA14T     NNK15MA02B  
Wednesday, December 13, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 4 - PROCURE MATERIAL&PARTS FOR SCIENCE CARRIERS AND SCIENCE CARRIER MICROCONTROLLER CHECKOUT UNIT 1.0 INTRODUCTION THE CONTRACTOR SHALL FABRICATE TWO SCIENCE CARRIER (2.8) ROOT TRAYS PER THE FINAL DESIGN AND IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001. THE CONTRACTOR SHALL ALSO FABRICATE A SCIENCE CARRIER MICROCONTROLLER CHECKOUT SYSTEM TO TEST ALL THE SENSORS THAT ARE IN THE ROOT TRAY. THE CONTRACTOR SHALL PROCURE THE FLIGHT PARTS FOR TWO SCIENCE CARRIER ROOT TRAYS AND THE GROUND PARTS AND FLIGHT PARTS REQUIRED TO INTERFACE WITH THE ROOT TRAY ELECTRONICS. PERIOD OF PERFORMANCE: ISSUANCE OF TASK ORDER THROUGH SEPTEMBER 30, 2016. 2.0 SUBSYSTEM FABRICATION 2.1 FABRICATION PROCEDURES THE CONTRACTOR SHALL UTILIZE EXISTING APPROVED FABRICATION PROCEDURES FOR THE SCIENCE CARRIER ROOT TRAYS (2.8). 2.2 ASSEMBLY TOOLING THE CONTRACTOR SHALL UTILIZE EXISTING TOOLING NECESSARY FOR ASSEMBLY OF THE SCIENCE CARRIER ROOT TRAYS AND CHECKOUT SYSTEM. 2.3 HARDWARE ASSEMBLY THE CONTRACTOR SHALL ASSEMBLE THE SCIENCE CARRIER ROOT TRAY HARDWARE IN A MATTER CONSISTENT WITH SPACEFLIGHT PAYLOADS AND TRAINED TO NASA STD-8739 AND PER FABRICATION PROCEDURES. 2.4 HARDWARE FUNCTIONAL TESTING THE CONTRACTOR SHALL UTILIZE EXISTING FUNCTIONAL TEST PLAN TO TEST THE SCIENCE CARRIER ROOT TRAY WITH THE CHECKOUT SYSTEM. 3.0 SCIENCE CARRIER MICROCONTROLLER CHECKOUT SYSTEM THE CONTRACTOR SHALL PROCURE MATERIAL AND FABRICATE A SCIENCE CARRIER MICROCONTROLLER CHECKOUT SYSTEM THAT IS COMPATIBLE WITH THE SCIENCE CARRIER ROOT TRAY ELECTRONICS. THE CONTRACTOR SHALL PROCURE HARDWARE THAT IS COMPATIBLE WITH A FLIGHT SCIENCE CARRIER ROOT TRAY. 4.0 MONTHLY REPORTS THE CONTRACTOR SHALL SUBMIT MONTHLY REPORTS OF ALL WORK ACCOMPLISHED DURING EACH MONTH OF CONTRACT PERFORMANCE. REPORTS SHALL BE IN NARRATIVE FORM, BRIEF, AND INFORMAL. THEY SHALL INCLUDE THE CONTRACT NUMBER, TASK ORDER NUMBER, A QUANTITATIVE DESCRIPTION OF PROGRESS, AN INDICATION OF ANY CURRENT PROBLEMS THAT MAY IMPEDE PERFORMANCE, PROPOSED CORRECTIVE ACTION, AND A DISCUSSION OF THE WORK TO BE PERFORMED DURING THE NEXT MONTHLY REPORTING PERIOD. MONTHLY REPORTS SHALL ALSO INCLUDE... MOD 6: MOD 6: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR MILESTONE #4 FROM 10/31/17 TO 12/31/17 AT NO ADDITIONAL COST TO THE GOVERNMENT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK16MA60T     NNK15MA02B  
Wednesday, December 13, 2017
$76,000.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF FLIGHT SUPPORT EQUIPMENT, RE-DESIGN, REPAIR AND REPLACE ADVANCED PLANT HABITAT (APH) UNIT, SUSTAINMENT AND REQUEST FOR INFORMATION. THE CONTRACTOR SHALL DESIGN AND PROCURE HARDWARE REQUIRED TO ASSEMBLE AND SUPPORT THE ACTIVATION OF THE FLIGHT UNIT ON THE INTERNATIONAL SPACE STATION (ISS). THE HARDWARE WILL CONSIST OF FIVE KITS WHICH ARE THE WATER RECOVERY AND DISTRIBUTION SUBSYSTEM (WRADS) RESERVOIR REFILL KIT, WRADS RESERVOIR SAMPLE KIT, WRADS MAINTENANCE KIT, APH AIR SAMPLE KIT, AND APH MAINTENANCE KIT. GENERAL DESCRIPTION: THE PLANT HABITAT (PH) PROVIDES A LARGE, ENCLOSED, ENVIRONMENTALLY CONTROLLED CHAMBER DESIGNED TO SUPPORT COMMERCIAL AND FUNDAMENTAL PLANT RESEARCH ONBOARD THE INTERNATIONAL SPACE STATION (ISS) FOR A MINIMUM OF 1-YEAR CONTINUOUS OPERATION WITHOUT MAINTENANCE. IT IS CONFIGURED AS A QUAD-LOCKER PAYLOAD TO BE MOUNTED IN A STANDARD EXPEDITE THE PROCESSING OF EXPERIMENTS TO THE SPACE STATION (EXPRESS) RACK IN THE U.S. LABORATORY. THE PH INTEGRATES PROVEN MICROGRAVITY PLANT GROWTH TECHNOLOGIES WITH NEWLY DEVELOPED FAULT TOLERANCE AND RECOVERY TECHNOLOGY TO INCREASE OVERALL EFFICIENCY, RELIABILITY, AND ROBUSTNESS. IN ADDITION, THE PH PROVIDES SINGLE-LEVEL CONTAINED, EMBEDDED GLOVE PORTS FOR THE CREW'S USE WHEN SAMPLING PLANT MATERIALS OR CONDUCTING EXPERIMENTS. THE DESIGN IS BASED ON AN OPEN ARCHITECTURE CONCEPT TO ALLOW CRITICAL SUBSYSTEMS TO BE REMOVED AND REPLACED ONBOARD THE ISS. THERE ARE A NUMBER OF DESIGN CHARACTERISTICS THAT SHOULD BE CONSIDERED IN THE DESIGN OF PH FLIGHT AND GROUND SYSTEMS, INCLUDING: - SAFETY AND MISSION SUCCESS - DESIGN FOR MINIMUM RISK - FAILURE PROPAGATION - PROGRAMMATIC RISK; -- MINIMIZING LIFE CYCLE COST AND IMPROVING OPERABILITY AND SUPPORTABILITY, INCLUDING DESIGN FOR MAINTAINABILITY, COMMONALITY, INTEROPERABILITY, INTERCHANGEABILITY, STANDARDIZATION, UPGRADEABILITY, OBSOLESCENCE TOLERANCE AND AUTOMATION -- NEED TO ACCOMPLISH MAJOR PROGRAM AND PROJECT MILESTONES IN A TIMELY MANNER TO ACHIEVE THE MILESTONES ESTABLISHED BY THE GP&R PROJECT. - MAINTAINABILITY - DESIGN SIMPLICITY - INTERFACE SIMPLICITY - DESIGN FOR HUMAN OPERABILITY MOD 4: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR MILESTONE #5 FROM 10/31/17 TO 2/28/18 AT NO ADDITIONAL COST TO THE GOVERNMENT. INCREASE THE CEILING PRICE FOR CLIN 002 T&M SUSTAINMENT TO $1,330,525.62 (ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK17MA28T     NNK15MA02B  
Thursday, December 7, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 1 FOR ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A.AVIONICS (2.1) THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARES BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 UMOL/M2S @ 15CM) AND LIGHT LEVEL (UMOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED. E. THERMAL CONTROL SYSTEM (TCS) (2.5) THE TCS CONSIST OF THE MODERATE TEMPERATURE LOOP (MTL) COLDPLATES ON THE ENVIRONMENTAL CONTROL SYSTEM (ECS), AVIONICS UNIT, PDA, AND GLA; IT ALSO CONSIST OF THE AVIONICS AIR ASSEMBLY (AAA) FORCED AIR FROM THE EXPRESS RACK THAT COOLS THE ORU DRAWER INSIDE THE PH CAVITY, AND INSIDE THE INTERNATIONAL SUBRACK INTERFACE STANDARD)(ISIS) DRAWER... MOD 14: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM MILESTONE #17 FROM 11/30/17 TO 12/31/18 AT NO ADDITIONAL COST TO THE GOVERNMENT.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK15MA03T     NNK15MA02B  
Wednesday, December 6, 2017
$0.00
7000: Department of Homeland Security
7014: U.S. CUSTOMS AND BORDER PROTECTION
70B02C: AIR AND MARINE CTR DIV

C: DELIVERY ORDER
MEA DELIVERY ORDER
1510: AIRCRAFT, FIXED WING

  HSBP1016J00693     HSBP1016D00011  
Wednesday, December 6, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 2 FOR ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A. AVIONICS (2.1) THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARE'S BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 UMOL/M2S @ 15CM) AND LIGHT LEVEL (UMOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED ... MOD 14: THE PURRPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR MILESTONES #20 AND 21 FROM NOVEMBER 30, 2017 TO JANUARY 31, 2018 AT NO ADDITIONAL COST TO THE GOVERNMENT. AS A RESULT, THE STATEMENT OF WORK 7.0 DELIVERABLES/MILESTONES SCHEDULE IS REVISED ACCORDINGLY. ALL OTHER TERMS AND CONDITIONS OF NNK15MA04T REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK15MA04T     NNK15MA02B  
Tuesday, December 5, 2017
$0.00
7000: Department of Homeland Security
7014: U.S. CUSTOMS AND BORDER PROTECTION
70B02C: AIR AND MARINE CTR DIV

C: DELIVERY ORDER
MEA AIRCRAFT
1510: AIRCRAFT, FIXED WING

  HSBP1017J00359     HSBP1016D00011  
Monday, November 27, 2017
$36,082.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80JSC0: NASA JOHNSON SPACE CENTER

C: DELIVERY ORDER
SIERRA NEVADA CORPORATION RODENT RESEARCH
AJ51: R&D- GENERAL SCIENCE/TECHNOLOGY: LIFE SCIENCES (BASIC RESEARCH)

  80JSC018F0034     80JSC017D0025  
Monday, November 20, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80JSC0: NASA JOHNSON SPACE CENTER

B: IDC
IGF::OT::IGFRESEARCH, ENGINEERING, AND MISSION INTEGRATION SERVICES (REMIS) THE SCOPE OF THE REMIS CONTRACT INCLUDES THE ABILITY TO SOLICIT SPACEFLIGHT AND GROUND HARDWARE AND SOFTWARE, SUSTAINING ENGINEERING FUNCTIONS, ENGINEERING SERVICES, PAYLOAD FACILITY INTEGRATION AND RESEARCH MISSION INTEGRATION AND OPERATIONS (MI&O) SERVICES REQUIRED BY THE ISS PROGRAM VIA CONTRACTS WITH MULTIPLE AWARDEES USING THEIR COMMERCIAL APPROACHES TO SATISFY THE SOW. OTHER NASA ORGANIZATIONS OR FEDERAL GOVERNMENT AGENCIES MAY UTILIZE THIS CONTRACT THROUGH A MUTUAL AGREEMENT WITH THE NASA ISS PROGRAM.
AR67: R&D- SPACE: STATION (COMMERCIALIZED)

  80JSC017D0018     NNJ17584385R  
Wednesday, November 8, 2017
$0.00
7000: Department of Homeland Security
7014: U.S. CUSTOMS AND BORDER PROTECTION
70B02C: AIR AND MARINE CTR DIV

B: IDC
MEA CONTRACT - MOD FOR CONSIDERATION
1510: AIRCRAFT, FIXED WING

  HSBP1016D00011     HSBP1015R0055  
Monday, November 6, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80NSSC: NASA SHARED SERVICES CENTER

D: DEFINITIVE CONTRACT
IGF::OT::IGF THE ZERO GRAVITY MASS MEASUREMENT DEVICE (ZGMMD) PROVIDES THE ABILITY TO MEASURE THE MASS OF SAMPLES IN A MICROGRAVITY ENVIRONMENT, LIKE THAT FOUND ON THE INTERNATIONAL SPACE STATION (ISS). ONE OF THE PRIMARY MEASUREMENTS OFTEN TAKEN DURING SCIENCE EXPERIMENTS IS MASS. THIS IS EVEN MORE RELEVANT IN BIOLOGY, WHERE MASS IS OFTEN ONE OF THE KEY MEASUREMENTS TAKEN FOR ANALYSIS. DURING THE PHASE I EFFORT, A ZGMMD PROTOTYPE WAS DEVELOPED, TESTED, AND DEMONSTRATED THE FEASIBILITY OF A MEANS TO DETERMINE THE MASS OF SAMPLES LESS THAN 1KG, WITHOUT THE USE OF EARTH'S GRAVITY. THE ZGMMD'S INNOVATIVE WAY OF DETERMINING THE MASS, OF LOW MASS OBJECTS, IN MICROGRAVITY ENVIRONMENTS HAS BEEN SHOWN TO BE FEASIBLE, AND EFFECTIVE. THE PHASE I PROTOTYPE HAS SHOWN TO BE ABLE TO PROVIDE GREAT MASS MEASUREMENT CAPABILITIES, EXCEEDING THE PHASE I REQUIREMENTS, SPECIFICALLY IN ACCURACY AND PRECISION.
AR11: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH)

  NNX14CA12C     NNX14SBIRSELECTPHAS11  
Friday, September 29, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

B: PURCHASE ORDER
IGF::OT::IGF VEGGIE SUSTAINING ENGINEERING 1.1 PURPOSE THE GOVERNMENT HAS IN TOTAL TWO FLIGHT VEGGIE UNITS, FOUR GROUND VEGGIE UNITS, AND FLIGHT/GROUND SPARES THAT WILL REQUIRE ENGINEERING SUPPORT THROUGH THIS CONTRACT. THE HARDWARE, FIRMWARE, AND SPARE ITEMS SOMETIMES REQUIRE DRAWING UPDATES, DESIGN MODIFICATIONS, AND POSSIBLY TROUBLESHOOTING AS WELL AS EXPERIMENT UNIQUE EQUIPMENT. THE GOVERNMENT REQUIRES SUSTAINING ENGINEERING SUPPORT FOR VEGGIE UNITS AND ASSOCIATED EQUIPMENT. 1.2 SUSTAINING ENGINEERING THE CONTRACTOR SHALL PROVIDE ALL RESOURCES AND SERVICES NECESSARY TO DELIVER AND/OR PERFORM THE REQUIREMENTS IN ACCORDANCE WITH SECTIONS 1.2.1 THROUGH 1.2.5. 1.2.1 DRAWINGS AND DRAWINGS UPDATES THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT AND ITS SUPPORT CONTRACTORS DRAWINGS, DRAWING UPDATES, AND ASSOCIATED PAPERWORK AS REQUIRED IN A TIMELY FASHION. FOR CRITICAL FLIGHT OPERATIONS AND ASSOCIATED GROUND ACTIVITIES THE GOVERNMENT WILL REQUIRE RESPONSES WITHIN 24 HOURS. FOR NON-CRITICAL OPERATIONS TO FACILITATE INTEGRATION AND OPERATIONS OF VEGGIE HARDWARE FOR SPACE STATION AND GROUND FUNCTION; DRAWINGS AND DRAWING UPDATES, DEPENDING ON COMPLEXITY SHALL BE SUPPLIED IN PDF AND NATIVE FORMAT WITHIN FIVE CALENDAR DAYS OF AN OFFICIAL REQUEST. 1.2.2 VEGGIE DESIGN MODIFICATIONS THE CONTRACTOR SHALL PROVIDE SOLUTIONS WITH SUPPORT TEST DATA FOR VEGGIE AND VEGGIE EQUIPMENT MODIFICATION AND UPGRADES. THESE SOLUTIONS IF ACCEPTED BY THE GOVERNMENT WILL BE REFLECTED IN DRAWINGS AND DRAWING UPDATES IN SECTION 1.2.1. AN EXAMPLE DESIGN MODIFICATION IS A PASSIVE ROOT MAT WHICH CAN DELIVER A HIGHER WATER FLOW RATE (WICK RATE) IN MICROGRAVITY FOR LARGE PLANTS SUCH AS TOMATO (FLOW RATE REQUIREMENTS ARE IN DEFINITION). ANOTHER EXAMPLE DESIGN MODIFICATION IS A BELLOWS MATERIAL WHICH MAINTAINS ISS SAFETY REQUIREMENTS AND LIMITS LIGHT POLLUTION INTO THE GROWTH VOLUME AND STILL ALLOWS THE PLANTS TO BE VIEWED FROM THE EXTERIOR (LIGHT TRANSMISSION CHARACTERISTICS IN DEFINITION). 1.2.3 VEGGIE ENGINEERING SUPPORT THE CONTRACTOR SHALL PROVIDE ENGINEERING SUPPORT AND ANALYSIS TO THE GOVERNMENT IN THE EVENT OF AN ANOMALY OR FAILURE OF VEGGIE AND VEGGIE ASSOCIATED HARDWARE PROCURED FROM CONTRACTOR. CONTRACTOR SHALL PROVIDE THE GOVERNMENT ENGINEERING SUPPORT AND ANALYSIS OF ANY EQUIPMENT WHICH WILL INTERFACE TO OR SUPPORT EXPERIMENTS WITHIN VEGGIE. THE END GOAL IS TO ENSURE THAT ITEMS WHICH COULD IMPACT, DAMAGE, OR SHORTEN THE LIFE OF VEGGIE ARE IDENTIFIED PRIOR TO INTERFACING OR BEING INTRODUCED INTO VEGGIE AND TO PROVIDE REAL-TIME SUPPORT FOR VEGGIE RELATED FAILURES OR ANOMALIES. MOD 1: THE PURPOSE OF THIS MODIFICATION IS FOR NASA TO RECOGNIZE SIERRA NEVADA CORPORATION (SNC) AS THE SUCCESSOR IN INTEREST TO ORBITEC. A NOVATION AGREEMENT WAS ACCEPTED BY DCMA ON BEHALF OF THE GOVERNMENT, WHICH INCLUDED NASA CONTRACTS. EACH NASA CONTRACT WITH ORBITEC IS BEING MODIFIED SEPARATELY TO RECOGNIZE SNC AS THE SUCCESSOR IN INTEREST TO ORBITEC. IN ADDITION, THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE FROM SEPTEMBER 30, 2017, TO OCTOBER 32, 2017, AT NO ADDITIONAL COST TO THE GOVERNMENT. SNC WILL NOTIFY NASA OF THE NUMBER OF HOURS REMAINING FOR THIS PERIOD.
AZ14: R&D- OTHER RESEARCH AND DEVELOPMENT (ENGINEERING DEVELOPMENT)

  NNK16MB03P     NNK16MB03Q  
Friday, September 29, 2017
$285,362.19
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF ADVANCED PLANT HABITAT (APH) TASK ORDER 7 HARDWARE FOR FLIGHT AND ENGINEERING DEVELOPMENT UNIT (EDU) AND FLIGHT SUPPORT EQUIPMENT 1.0 INTRODUCTION THE CONTRACTOR SHALL PROVIDE CARBON DIOXIDE (CO2) BOTTLES (2.6), ENVIRONMENTAL CONTROL SUBSYSTEM INLET AND OUTLET FILTERS (2.7), ETHYLENE SCRUBBER (2.7.1), CARBON DIOXIDE SCRUBBER (2.7.1), AND SCIENCE CARRIER (2.8) FLIGHT HARDWARE TO SUPPORT THE MAINTENANCE OF BOTH FLIGHT UNITS AFTER THE FIRST USE ON ISS AND ON THE GROUND WHICH IS A PRE-OPERATION TO THE START OF THE FIRST SCIENCE EXPERIMENT (PH-01). THE ITEMS PROVIDED FOR THE ADVANCED PLANT HABITAT FLIGHT AND EDU HARDWARE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001. PERIOD OF PERFORMANCE: ISSUANCE OF TASK ORDER THROUGH OCTOBER 31, 2017. 2.0 HARDWARE AND FLIGHT SUPPORT EQUIPMENT THE CONTRACTOR SHALL PROVIDE FLIGHT READY HARDWARE CONSISTING OF: 2 CO2 BOTTLES, 2 ECS INLET AND 2 OUTLET FILTERS (TOTAL FOR 2 ECS MODULES), 1 ETHYLENE SCRUBBER, 1 CARBON DIOXIDE SCRUBBER, AND 2 SCIENCE CARRIER ROOT TRAYS WITH 2 SPARE OXYGEN SENSORS PER TRAY. (NOTE: THE OXYGEN SENSORS SHOULD BE TESTED BY THE CONTRACTOR PRIOR TO ACCEPTING THEM FROM THE VENDOR. ALSO, THE CONTRACTOR MUST USE EXTREME CAUTION WHILE HANDLING THE SENSORS DURING ASSEMBLY AND TEST.) 3.0 DELIVERABLES-MILESTONE SCHEDULE 1.) SUBJECT TO OTHER LIMITATIONS AND CONDITIONS SPECIFIED IN THIS CONTRACT, MILESTONE PAYMENTS SHALL BE MADE TO THE CONTRACTOR UPON DELIVERY AND ACCEPTANCE OF THE MILESTONE EVENTS DESCRIBED IN THE BELOW TABLE. 2.) THE CONTRACTOR SHALL NOT BE ENTITLED TO PAYMENT OF A REQUEST FOR MILESTONE PAYMENT PRIOR TO SUCCESSFUL ACCOMPLISHMENT AND ACCEPTANCE BY THE GOVERNMENT OF THE MILESTONE EVENT. THE CONTRACTING OFFICER SHALL DETERMINE WHETHER THE MILESTONE EVENT OR PERFORMANCE CRITERION FOR WHICH PAYMENT IS REQUESTED HAS BEEN SUCCESSFULLY ACCOMPLISHED AND ACCEPTED BY THE GOVERNMENT IN ACCORDANCE WITH THE TERMS OF THE CONTRACT. THE CONTRACTING OFFICER MAY, AT ANY TIME, REQUIRE THE CONTRACTOR TO SUBSTANTIATE THE SUCCESSFUL PERFORMANCE OF ANY EVENT OR PERFORMANCE CRITERION WHICH HAS BEEN OR IS REPRESENTED AS BEING PAYABLE.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  80KSC017F0138     NNK15MA02B  
Thursday, September 28, 2017
$328,507.00
7000: Department of Homeland Security
7009: U.S. SECRET SERVICE
70US09: U. S. SECRET SERVICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF FIELD TEST SUPPORT FOR COMPANY PROPRIETARY EQUIPMENT/SYSTEMS
J059: MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS

  HSSS0115C0005  
Wednesday, September 27, 2017
$2,997,945.00
9700: Department of Defense
2100: DEPT OF THE ARMY
W911W6: ACC-AVIATION APPLIED TECHNOLOGY DIR

D: DEFINITIVE CONTRACT
IGF::OT::IGF SIERRA NEVADA CORP. ~ FY16 RIF
AC12: R&D- DEFENSE SYSTEM: AIRCRAFT (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT)

  W911W617C0022  
Wednesday, September 27, 2017
$339,224.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862017F4002     FA862016G3013  
Wednesday, September 27, 2017
$1,656,364.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R425: SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL

  FA862017F4146     FA862016G3013  
Wednesday, September 27, 2017
$0.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N68335: NAVAIR WARFARE CTR AIRCRAFT DIV LKE

D: BOA
IGF::OT::IGF
AC65: R&D- DEFENSE SYSTEM: ELECTRONICS/COMMUNICATION EQUIPMENT (OPERATIONAL SYSTEMS DEVELOPMENT)

  N6833515G0027     N6833515R0614  
Wednesday, September 27, 2017
$1,297,221.00
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92222: USSOCOM REGIONAL CONTRACTING OFFICE

C: DELIVERY ORDER
FULLY FUND CLIN 0001 WITH THE REMAINING BALANCE OF $1,297,221.00.
7030: INFORMATION TECHNOLOGY SOFTWARE

  0010     H9222214D0023  
Wednesday, September 27, 2017
$143,636.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R425: SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL

  FA862017F4146     FA862016G3013  
Wednesday, September 27, 2017
$5,432,074.42
9700: Department of Defense
1700: DEPT OF THE NAVY
N68335: NAVAIR WARFARE CTR AIRCRAFT DIV LKE

C: DELIVERY ORDER
UCARS
5895: MISCELLANEOUS COMMUNICATION EQUIPMENT

  N6833517F0040     N6833515G0027     N6833517R0140  
Wednesday, September 27, 2017
$935,937.75
9700: Department of Defense
97AS: DEFENSE LOGISTICS AGENCY
SPRPA1: DLA AVIATION AT PHILADELPHIA, PA

D: DEFINITIVE CONTRACT
BEACON RCVR ASSY,AI
5826: RADIO NAVIGATION EQUIPMENT, AIRBORNE

  SPRPA117CX039     SPRPA117RX445  
Wednesday, September 27, 2017
$5,793,055.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8637: FA8637 AFLCMC WWYA

C: DELIVERY ORDER
FY18/19 ICS ADDITIONAL TASKS
1510: AIRCRAFT, FIXED WING

  0001     FA863713D6003  
Tuesday, September 26, 2017
($117,346.53)
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92241: USSOCOM TAKO CONTRACTING OFFICE

C: DELIVERY ORDER
INTEGRATED SYSTEM DEMO
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  0004     H9224113D0010     H9224112R0018  
Tuesday, September 26, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
ACAT III BIG SAFARI
1510: AIRCRAFT, FIXED WING

  FA862016F4008     FA862011G4020  
Tuesday, September 26, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
ACAT III BIG SAFARI
1510: AIRCRAFT, FIXED WING

  FA862017F4074     FA862016G3013  
Tuesday, September 26, 2017
$7,084,269.00
9700: Department of Defense
2100: DEPT OF THE ARMY
W911QX: W6QK ACC-APG ADELPHI

C: DELIVERY ORDER
IGF::OT::IGF DHS ENGINEERING, TEST, EVALUATION (DETE)
AJ41: R&D- GENERAL SCIENCE/TECHNOLOGY: ENGINEERING (BASIC RESEARCH)

  0003     W911QX16D0013  
Tuesday, September 26, 2017
$794,970.17
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA7037: FA7037 AMIC DET 2 PKA

C: DELIVERY ORDER
IGF::OT::IGF TACTICAL SYSTEMS EMULATOR SUPPORT
R425: SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL

  0001     FA703716D0007     FA703716R0003  
Monday, September 25, 2017
$2,990,079.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862016F4011     FA862011G4020  
Monday, September 25, 2017
$250,000.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80JSC0: NASA JOHNSON SPACE CENTER

B: IDC
IGF::OT::IGF ON ORBIT MASS MEASUREMENT DEVICE, MMD. MMD PROVIDES A SYSTEM TO QUANTIFY THE MASS OF OBJECTS, INCLUDING LIVE ANIMAL SPECIMENS, IN THE MICROGRAVITY ENVIRONMENT. MMD MEETS THE MASS MEASURING NEEDS FOR FUNDAMENTAL SPACE LIFE AND PHYSICAL SCIENCE EXPERIMENTS, SUCH AS RODENT AND PLANT RESEARCH, BY PROVIDING THE CAPABILITY TO MEASURE MASS IN THE RANGE OF 1 TO 100 GRAMS. THE MMD IS PLANNED FOR EMPLOYMENT ON A SEAT TRACK IN THE US LAB MODULE, AND ITS MODULARITY ALSO PROVIDES FOR OPERATION IN ALTERNATIVE LOCATIONS SUCH AS THE ISS MICROGRAVITY SCIENCE GLOVEBOX (MSG) TO ALLOW CONCURRENT OPERATION WITH OTHER SPACE BIOLOGY OR RODENT RESEARCH EXPERIMENTATION.
AJ51: R&D- GENERAL SCIENCE/TECHNOLOGY: LIFE SCIENCES (BASIC RESEARCH)

  80JSC017D0025  
Monday, September 25, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8656: FA8656 LCMC OL PK RAC

C: DELIVERY ORDER
POP EXTENSION WITH CONSIDERATION
1730: AIRCRAFT GROUND SERVICING EQUIPMENT

  0001     FA865616D0098  
Monday, September 25, 2017
$5,906,190.42
9700: Department of Defense
2100: DEPT OF THE ARMY
W911QX: W6QK ACC-APG ADELPHI

D: DEFINITIVE CONTRACT
IGF::OT::IGF INCREMENTAL FUNDING
AJ41: R&D- GENERAL SCIENCE/TECHNOLOGY: ENGINEERING (BASIC RESEARCH)

  W911QX16C0017     W911NF12R0011  
Friday, September 22, 2017
($1,434,695.00)
9700: Department of Defense
9763: DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA)
S1110A: DCMA AIMO ST AUGUSTINE

C: DELIVERY ORDER
IGF::OT::IGF DEOBLIGATE FUNDS FROM CLINS.
1510: AIRCRAFT, FIXED WING

  0001     FA863713D6003  
Friday, September 22, 2017
$96,937.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862017F4001     FA862016G3013  
Friday, September 22, 2017
$851,888.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::OT::IGF ACAT III BIG SAFARI
D318: IT AND TELECOM- INTEGRATED HARDWARE/SOFTWARE/SERVICES SOLUTIONS, PREDOMINANTLY SERVICES

  FA862017F4121     FA862016G3013  
Friday, September 22, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

B: IDC
IGF::OT::IGF ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A. AVIONICS (2.1) - THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) - THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARE'S BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) - THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 MOL/M2S @ 15CM) AND LIGHT LEVEL (MOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) - THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED. E. THERMAL CONTROL SYSTEM (TCS) (2.5) - THE TCS CONSIST OF THE MODERATE TEMPERATURE LOOP (MTL) COLD PLATES ON THE ENVIRONMENTAL CONTROL SYSTEM (ECS), AVIONICS UNIT, PDA, AND GLA. MOD 6: THE PURPOSE OF MODIFICATION 000006 IS TO INCORPORATE T&M LABOR RATES FOR FY17 AND FY18 FOR TASK ORDER NNK17MA28T, WHICH IS THE ONLY TASK ORDER THAT CURRENTLY HAS ANY T&M EFFORT. THE RATES ARE THE SAME RATES AS THE FFP RATES, BUT HAVE THE PRE-NEGOTIATED PROFIT RATE OF 10% INCLUDED IN THE RATE. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK15MA02B     NNK14ZMS004R  
Thursday, September 21, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 1 FOR ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A.AVIONICS (2.1) THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARES BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 UMOL/M2S @ 15CM) AND LIGHT LEVEL (UMOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED. E. THERMAL CONTROL SYSTEM (TCS) (2.5) THE TCS CONSIST OF THE MODERATE TEMPERATURE LOOP (MTL) COLDPLATES ON THE ENVIRONMENTAL CONTROL SYSTEM (ECS), AVIONICS UNIT, PDA, AND GLA; IT ALSO CONSIST OF THE AVIONICS AIR ASSEMBLY (AAA) FORCED AIR FROM THE EXPRESS RACK THAT COOLS THE ORU DRAWER INSIDE THE PH CAVITY, AND INSIDE THE INTERNATIONAL SUBRACK INTERFACE STANDARD)(ISIS) DRAWER... MOD 13: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FORM 7/31/17 TO 11/30/17 AT NO ADDITIONAL COST TO THE GOVERNMENT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK15MA03T     NNK15MA02B  
Thursday, September 21, 2017
$500,000.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80HQTR: NASA HEADQUARTERS

D: DEFINITIVE CONTRACT
IGF::OT::IGF NEXTSTEP NRA AWARD. PHASE I AND PHASE II. THIS CONTRACT INVOLVES DEVELOPMENT AND DEMONSTRATION OF A HYBRID LIFE SUPPORT SYSTEMS (HLSS) THAT WILL ENABLE OPERATIONALLY EFFICIENT AND EFFECTIVE EXPLORATION ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS THROUGH HYBRID TECHNOLOGIES THAT CAN BE EVOLVED TO MEET LONG-DURATION LIFE SUPPORT REQUIREMENTS FOR SUSTAINED HABITATION AT MUCH LOWER LIFE CYCLE COSTS. CURRENT STATE-OF-THE-ART TECHNOLOGY BEING FLOWN ON THE ISS ALLOWS FOR ONLY 25-50 PERCENT RESOURCE RECOVERY DEPENDING UPON THE RESOURCE IN QUESTION, WHETHER OXYGEN, WATER, OR CARBON. STRATEGICALLY AND OPERATIONALLY VALUABLE BIOREGENERATIVE CAPABILITY THAT COMBINES WATER RECYCLING, AIR REVITALIZATION, FOOD AUGMENTATION AND RADIATION PROTECTION INCREASES TOTAL SYSTEM CLOSURE TO AN ESTIMATED 50-85 PERCENT RESOURCE RECOVERY, AND DECREASES THE TOTAL MISSION MASS AND THEREBY COST-EFFECTIVELY EXTENDING SUSTAINABLE LONG-DURATION HUMAN MISSIONS. THE HLSS INTEGRATES NOMINAL PIC LIFE SUPPORT FOR TRANSITIONAL SHORT DURATIONS AUGMENTED WITH BIOLOGICALLY BASED LIFE SUPPORT TO EXTEND MISSION DURATIONS TO YEARS WITH MINIMAL RESUPPLY. THE SMALLER PHYSICAVCHEMICAL SYSTEM ALSO PROVIDES BACKUP AND SAFE HAVEN CAPABILITIES. ORBITEC PROPOSES A STEPWISE DEMONSTRATION OF THE HLSS THAT RAPIDLY EVOLVES CURRENT SYSTEMS AND CAPABILITIES INTO LONG DURATION LIFE SUPPORT APPLICABLE TO SEVERAL EXPLORATION SUPPORT MODULE CONFIGURATIONS: PHASE I GROUND DEVELOPMENT, COMPONENT, SUBSYSTEM, AND SUB SCALE SYSTEMS PHASE IT ISS AND LEO SORTIE TESTS, SUBSYSTEM, SUBSCALE SYSTEM TESTING PHASE GROUND-BASED HLSS TEST BED, FULL SCALE INTEGRATED TESTING PHASE N LEO AND/OR CISLUNAR TEST BEDS PHASE V DEEP SPACE FULL SCALE DEMONSTRATOR THE HLSS INTEGRATES ESTABLISHED PHYSICAVCHEMICAL (PIC) LIFE SUPPORT COMPONENTS AS A BASE CAPABILITY WITH BIOPRODUCTION (BID) SYSTEMS FOR WATER AND ATMOSPHERE PROCESSING AND FOOD AUGMENTATION, BRINGING REDUCTIONS IN TOTAL MASS LAUNCHED FOR LONG-DURATION MISSIONS. THE BIO SYSTEM ENABLES A SMALLER PIC SYSTEM AND PROVIDES RESUPPLY SAVINGS THAT HAVE COST SAVINGS ADVANTAGES FOR ANY SUSTAINED HUMAN OPERATION THAT IS GREATER THAN ONE YEAR, -MAKING THE HLSS RELEVANT FOR CONTINUOUS LEO OPERATIONS, CISLUNAR AND MARS TRANSIT MISSIONS IN ADDITION TO PLANETARY SURFACE OR DEEP SPACE MISSIONS. THE IMPROVED COST EFFECTIVENESS WOULD BE GREATLY ATTRACTIVE TO COMMERCIAL PROVIDERS TO LEO AND OTHER DESTINATIONS. THIS INITIAL EFFORT WILL FULLY ASSESS THE OPTIONS, PERFORMANCE, AND RELIABILITY OF HLSS FOR VARIOUS MISSION SCENARIOS BASED ON PRIOR GROUND-BASED TESTING AND CURRENT BIOLOGICAL FLIGHT SYSTEMS INCLUDING VEGGIE, THE FIRST FOOD PRODUCTION SYSTEM TO BE DEMONSTRATED ON ISS. IN THE NEAR TERM, HLSS WOULD RESULT IN FOOD AUGMENTATION, PROVIDING FRESH FOOD FOR HEALTH AND PSYCHOLOGICAL BENEFITS, AND INCREASED WATER RECYCLING AND ATMOSPHERE REVITALIZATION, OFF-LOADING DEMANDS ON A SMALLER PIC SYSTEM, ULTIMATELY REDUCING POWER, MASS, AND MAINTENANCE NEEDS. CONCEPTS OF HLSS OPERATION WILL BE DEFINED FOR CANDIDATE EXPLORATION AUGMENTATION MODULES AND FOR VARIOUS MISSION CLASSES, AND USED TO CONDUCT TRADE ANALYSES USING AN IN-HOUSE MODELING PROGRAM THAT ALLOWS PIC AND BID LIFE SUPPORT SUBSYSTEMS AND COMPONENTS TO BE ANALYZED AS PART OF AN INTEGRATED LIFE SUPPORT SYSTEM. ACTIVITIES WILL INCLUDE A DEMONSTRATION OF EXPANDED BIOPRODUCTION FLIGHT SYSTEMS WITHIN ORBITEC'S EXISTING CONTROLLED ENVIRONMENT FACILITIES.
AR21: R&D- SPACE: SCIENCE/APPLICATIONS (BASIC RESEARCH)

  NNH15CN77C     NNH15ZCQ001K  
Thursday, September 21, 2017
($295,160.00)
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862017F4055     FA862016G3013  
Thursday, September 21, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
ACAT III BIG SAFARI
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  FA862017F4073     FA862016G3013  
Thursday, September 21, 2017
$2,000,000.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8637: FA8637 AFLCMC WWYA

C: DELIVERY ORDER
ESTABLISHMENT OF CLINS 1809, 1819, 1820, 1823, 1859, AND 1860
1510: AIRCRAFT, FIXED WING

  0001     FA863713D6003  
Thursday, September 21, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 3 FOR ADVANCED PLANT HABITAT. 1.0 THE CONTRACTOR SHALL TEST (6.0) FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF ORUS FOR ALL APH SUBSYSTEMS WHICH INCLUDE THE AVIONICS (2.1), SOFTWARE (2.2), GROWTH LIGHT ASSEMBLY (GLA) (2.3), POWER DISTRIBUTION ASSEMBLY (PDA) (2.4), THERMAL CONTROL SYSTEM (TCS) (2.5), WATER RECOVERY AND DISTRIBUTION SYSTEM (WRADS) (2.6), ENVIRONMENTAL CONTROL SYSTEM (ECS) (2.7), SCIENCE CARRIER (2.8), GROWTH CHAMBER COMPONENTS (2.9), AND STRUCTURAL MOUNTING ASSEMBLY (SMA) (2.10) IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001 AND INTERFACE CONTROL DOCUMENT (ICD) SSP-53145. THE CONTRACTOR SHALL LEAD AND DEVELOP CREW TRAINING VIDEO AND SUPPORT THE DEVELOP CREW PROCEDURES FOR FLIGHT. THE CONTRACTOR SHALL LEAD THE PHASE 3 SAFETY DATA PACKAGE (5.2) EFFORTS FOR ALL APH SUBSYSTEMS. THE CONTRACTOR SHALL PROVIDE A MATERIAL INSPECTION AND RECEIVING REPORT (FORM DD250) FOR FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF ORUS AT THE KENNEDY SPACE CENTER. 2.0 FLIGHT HARDWARE TESTING 2.1 PRE-PROTO-FLIGHT TESTING THE CONTRACTOR SHALL PERFORM A CO2 INJECTION TEST AND CO2 CARTRIDGE VIBE TEST ON THE ENGINEERING DEVELOPMENT UNIT (EDU) PRIOR TO PROTO-FLIGHT TESTING (ECS (2.7)). 2.2 PROTO-FLIGHT TESTING THE CONTRACTOR SHALL DEVELOP PROTO-FLIGHT TEST PROCEDURES AND PERFORM PROTO-FLIGHT TESTING ON FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF FLIGHT ORUS WHICH INCLUDES THE AVIONICS (2.1), SOFTWARE (2.2), GLA (2.3), PDA (2.4), TCS (2.5), WRADS (2.6), ECS (2.7), SCIENCE CARRIER (2.8), GROWTH CHAMBER COMPONENTS (2.9), AND SMA (2.10). THE CONTRACTOR SHALL SUBMIT THE FINAL PROTO-FLIGHT TEST PROCEDURES TO THE CONTRACTING OFFICE FOR APPROVAL AND CONCURRENCE PRIOR TO STARTING THE PROTO-FLIGHT TESTING. THE PROTO-FLIGHT TESTING CONSISTS OF AN ELECTROMAGNETIC TEST (EMI), VIBRATION TESTING, ACOUSTICS TESTING, OFF GAS TESTING, AND PAYLOAD RACK CHECKOUT UNIT TESTING (PRCU). 2.3 ACCEPTANCE TESTING THE CONTRACTOR SHALL DEVELOP ACCEPTANCE TEST PROCEDURES AND PERFORM ACCEPTANCE TESTING ON FLIGHT UNIT #1, FLIGHT UNIT #2, AND TWO SETS OF FLIGHT ORUS WHICH INCLUDES THE AVIONICS (2.1), SOFTWARE (2.2), GLA (2.3), PDA (2.4), TCS (2.5), WRADS (2.6), ECS (2.7), SCIENCE CARRIER (2.8), GROWTH CHAMBER COMPONENTS (2.9), AND SMA (2.10) MOD 5: THE PURPOSE OF MODIFICATION 000003 TO TASK ORDER #3, NNK16MA14T, IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) FOR MILESTONE #11 FROM 30 SEP 2017 TO 30 NOV 2017 AT NO ADDITIONAL COST TO THE GOVERNMENT. AS A RESULT, THE STATEMENT OF WORK (SOW) 9.0 - DELIVERABLE/MILESTONE SCHEDULE IS REVISED ACCORDINGLY. (SEE ATTACHED) ALL OTHER TERMS AND CONDITIONS OF NNK16MA14T REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK16MA14T     NNK15MA02B  
Thursday, September 21, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 4 - PROCURE MATERIAL&PARTS FOR SCIENCE CARRIERS AND SCIENCE CARRIER MICROCONTROLLER CHECKOUT UNIT 1.0 INTRODUCTION THE CONTRACTOR SHALL FABRICATE TWO SCIENCE CARRIER (2.8) ROOT TRAYS PER THE FINAL DESIGN AND IN ACCORDANCE WITH THE REQUIREMENTS IN SYSTEM REQUIREMENTS DOCUMENT (SRD) FOR THE PLANT HABITAT (PH) PH-R0001. THE CONTRACTOR SHALL ALSO FABRICATE A SCIENCE CARRIER MICROCONTROLLER CHECKOUT SYSTEM TO TEST ALL THE SENSORS THAT ARE IN THE ROOT TRAY. THE CONTRACTOR SHALL PROCURE THE FLIGHT PARTS FOR TWO SCIENCE CARRIER ROOT TRAYS AND THE GROUND PARTS AND FLIGHT PARTS REQUIRED TO INTERFACE WITH THE ROOT TRAY ELECTRONICS. PERIOD OF PERFORMANCE: ISSUANCE OF TASK ORDER THROUGH SEPTEMBER 30, 2016. 2.0 SUBSYSTEM FABRICATION 2.1 FABRICATION PROCEDURES THE CONTRACTOR SHALL UTILIZE EXISTING APPROVED FABRICATION PROCEDURES FOR THE SCIENCE CARRIER ROOT TRAYS (2.8). 2.2 ASSEMBLY TOOLING THE CONTRACTOR SHALL UTILIZE EXISTING TOOLING NECESSARY FOR ASSEMBLY OF THE SCIENCE CARRIER ROOT TRAYS AND CHECKOUT SYSTEM. 2.3 HARDWARE ASSEMBLY THE CONTRACTOR SHALL ASSEMBLE THE SCIENCE CARRIER ROOT TRAY HARDWARE IN A MATTER CONSISTENT WITH SPACEFLIGHT PAYLOADS AND TRAINED TO NASA STD-8739 AND PER FABRICATION PROCEDURES. 2.4 HARDWARE FUNCTIONAL TESTING THE CONTRACTOR SHALL UTILIZE EXISTING FUNCTIONAL TEST PLAN TO TEST THE SCIENCE CARRIER ROOT TRAY WITH THE CHECKOUT SYSTEM. 3.0 SCIENCE CARRIER MICROCONTROLLER CHECKOUT SYSTEM THE CONTRACTOR SHALL PROCURE MATERIAL AND FABRICATE A SCIENCE CARRIER MICROCONTROLLER CHECKOUT SYSTEM THAT IS COMPATIBLE WITH THE SCIENCE CARRIER ROOT TRAY ELECTRONICS. THE CONTRACTOR SHALL PROCURE HARDWARE THAT IS COMPATIBLE WITH A FLIGHT SCIENCE CARRIER ROOT TRAY. 4.0 MONTHLY REPORTS THE CONTRACTOR SHALL SUBMIT MONTHLY REPORTS OF ALL WORK ACCOMPLISHED DURING EACH MONTH OF CONTRACT PERFORMANCE. REPORTS SHALL BE IN NARRATIVE FORM, BRIEF, AND INFORMAL. THEY SHALL INCLUDE THE CONTRACT NUMBER, TASK ORDER NUMBER, A QUANTITATIVE DESCRIPTION OF PROGRESS, AN INDICATION OF ANY CURRENT PROBLEMS THAT MAY IMPEDE PERFORMANCE, PROPOSED CORRECTIVE ACTION, AND A DISCUSSION OF THE WORK TO BE PERFORMED DURING THE NEXT MONTHLY REPORTING PERIOD. MONTHLY REPORTS SHALL ALSO INCLUDE... MOD 5: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 8/15/17 TO 10/31/17 AT NO ADDITIONAL COST TOTHE GOVERNMENT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK16MA60T     NNK15MA02B  
Thursday, September 21, 2017
$803,372.32
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862017F4105     FA862016G3013  
Thursday, September 21, 2017
$22,367,753.23
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92241: USSOCOM TAKO CONTRACTING OFFICE

C: DELIVERY ORDER
INTEGRATED SYSTEM DEMO
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  0004     H9224113D0010     H9224112R0018  
Thursday, September 21, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF FLIGHT SUPPORT EQUIPMENT, RE-DESIGN, REPAIR AND REPLACE ADVANCED PLANT HABITAT (APH) UNIT, SUSTAINMENT AND REQUEST FOR INFORMATION. THE CONTRACTOR SHALL DESIGN AND PROCURE HARDWARE REQUIRED TO ASSEMBLE AND SUPPORT THE ACTIVATION OF THE FLIGHT UNIT ON THE INTERNATIONAL SPACE STATION (ISS). THE HARDWARE WILL CONSIST OF FIVE KITS WHICH ARE THE WATER RECOVERY AND DISTRIBUTION SUBSYSTEM (WRADS) RESERVOIR REFILL KIT, WRADS RESERVOIR SAMPLE KIT, WRADS MAINTENANCE KIT, APH AIR SAMPLE KIT, AND APH MAINTENANCE KIT. GENERAL DESCRIPTION: THE PLANT HABITAT (PH) PROVIDES A LARGE, ENCLOSED, ENVIRONMENTALLY CONTROLLED CHAMBER DESIGNED TO SUPPORT COMMERCIAL AND FUNDAMENTAL PLANT RESEARCH ONBOARD THE INTERNATIONAL SPACE STATION (ISS) FOR A MINIMUM OF 1-YEAR CONTINUOUS OPERATION WITHOUT MAINTENANCE. IT IS CONFIGURED AS A QUAD-LOCKER PAYLOAD TO BE MOUNTED IN A STANDARD EXPEDITE THE PROCESSING OF EXPERIMENTS TO THE SPACE STATION (EXPRESS) RACK IN THE U.S. LABORATORY. THE PH INTEGRATES PROVEN MICROGRAVITY PLANT GROWTH TECHNOLOGIES WITH NEWLY DEVELOPED FAULT TOLERANCE AND RECOVERY TECHNOLOGY TO INCREASE OVERALL EFFICIENCY, RELIABILITY, AND ROBUSTNESS. IN ADDITION, THE PH PROVIDES SINGLE-LEVEL CONTAINED, EMBEDDED GLOVE PORTS FOR THE CREW'S USE WHEN SAMPLING PLANT MATERIALS OR CONDUCTING EXPERIMENTS. THE DESIGN IS BASED ON AN OPEN ARCHITECTURE CONCEPT TO ALLOW CRITICAL SUBSYSTEMS TO BE REMOVED AND REPLACED ONBOARD THE ISS. THERE ARE A NUMBER OF DESIGN CHARACTERISTICS THAT SHOULD BE CONSIDERED IN THE DESIGN OF PH FLIGHT AND GROUND SYSTEMS, INCLUDING: - SAFETY AND MISSION SUCCESS - DESIGN FOR MINIMUM RISK - FAILURE PROPAGATION - PROGRAMMATIC RISK; -- MINIMIZING LIFE CYCLE COST AND IMPROVING OPERABILITY AND SUPPORTABILITY, INCLUDING DESIGN FOR MAINTAINABILITY, COMMONALITY, INTEROPERABILITY, INTERCHANGEABILITY, STANDARDIZATION, UPGRADEABILITY, OBSOLESCENCE TOLERANCE AND AUTOMATION -- NEED TO ACCOMPLISH MAJOR PROGRAM AND PROJECT MILESTONES IN A TIMELY MANNER TO ACHIEVE THE MILESTONES ESTABLISHED BY THE GP&R PROJECT. - MAINTAINABILITY - DESIGN SIMPLICITY - INTERFACE SIMPLICITY - DESIGN FOR HUMAN OPERABILITY MOD 3: THE PURPOSE OF MODIFICATION 3 IS TO EXTEND THE PERIOD OF PERFORMANCE FOR MILESTONE 5 FROM 9/30/17 TO 10/31/17 AT NO ADDITIONAL COST TO THE GOVERNMENT. AS A RESULT THE STATEMENT OF WORK 9.0 DELIVERABLES/MILESTONE SCHEDULE IS REVISED ACCORDINGLY. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK17MA28T     NNK15MA02B  
Thursday, September 21, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80KSC0: NASA KENNEDY SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGF TASK ORDER 2 FOR ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A. AVIONICS (2.1) THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARE'S BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 UMOL/M2S @ 15CM) AND LIGHT LEVEL (UMOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED ... MOD 13: THE PURRPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR MILESTONES #20&21 FROM 8/15/17 TO 11/30/17 AT NO ADDITIONAL COST TO THE GOVERNMENT. AS A RESULT, THE STATEMENT OF WORK 7.0 DELIVERABLES/MILESTONES SCHEDULE IS REVISED ACCORDINGLY. ALL OTHER TERMS AND OCNDITIONS REMAIN UNCHANGED.
AR14: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT)

  NNK15MA04T     NNK15MA02B  
Thursday, September 21, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862016F4011     FA862011G4020  
Thursday, September 21, 2017
$39,555,744.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8637: FA8637 AFLCMC WWYA

C: DELIVERY ORDER
ESTABLISHMENT OF CLINS 1809, 1819, 1820, 1823, 1859, AND 1860
1510: AIRCRAFT, FIXED WING

  0001     FA863713D6003  
Thursday, September 21, 2017
$34,084,727.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862017F4105     FA862016G3013  
Wednesday, September 20, 2017
$550,616.94
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92222: USSOCOM REGIONAL CONTRACTING OFFICE

C: DELIVERY ORDER
ENGINEERING SUPPORT
5865: ELECTRONIC COUNTERMEASURES, COUNTER-COUNTERMEASURES AND QUICK REACTION CAPABILITY EQUIPMENT

  0002     H9222217D0023     H9222217R0001  
Wednesday, September 20, 2017
($115,000.00)
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8750: FA8750 AFRL RIK

D: DEFINITIVE CONTRACT
IGF::OT::IGF PERSISTENT SURVEILLENCE SIGNATURE ANALYSIS II (PSSA II)
AD94: R&D- DEFENSE OTHER: OTHER (ENGINEERING DEVELOPMENT)

  FA875013C0022  
Wednesday, September 20, 2017
$0.00
9700: Department of Defense
2100: DEPT OF THE ARMY
W15P7T: W6QK ACC-APG

C: DELIVERY ORDER
TO CORRECT LOA FOR SLIN 4028BJ / NOW REPRESENTED AS 4028BM
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  0033     W15P7T12D0019  
Wednesday, September 20, 2017
$0.00
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92241: USSOCOM TAKO CONTRACTING OFFICE

B: IDC
PHASE III - INTEGRATED SYS DEMO
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  H9224113D0010     H9224112R0018  
Wednesday, September 20, 2017
($6,005,075.95)
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92241: USSOCOM TAKO CONTRACTING OFFICE

C: DELIVERY ORDER
PHASE III - INTEGRATED SYS DEMO
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  0003     H9224113D0010     H9224112R0018  
Wednesday, September 20, 2017
$695,765.15
9700: Department of Defense
2100: DEPT OF THE ARMY
W15P7T: W6QK ACC-APG

C: DELIVERY ORDER
PROCURE (1886) CHARGER SUBASSEMBLIES, (1521) BATTERY POWER SOURCE, (6434) CABLE ASSEMBLY SPEC, (5000) SEAL NONMETALLIC ST, (3135) COMMUNICATIONS SECU, (1841) CAP, PROTECTIVE, DUST, (4761) HOLDER, STYLUS, (5012) BATTERY POWER SOURCE
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  0048     W15P7T12D0019  
Wednesday, September 20, 2017
$894,591.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N00019: NAVAL AIR SYSTEMS COMMAND

C: DELIVERY ORDER
FUND SOCOM CLINS 0007-0009
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  N0001917F1048     N0001917D0009     N0001916R0064  
Tuesday, September 19, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
J015: MAINT/REPAIR/REBUILD OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS

  0061     FA862011G4020  
Tuesday, September 19, 2017
$1,733,853.60
9700: Department of Defense
2100: DEPT OF THE ARMY
W15P7T: W6QK ACC-APG

C: DELIVERY ORDER
THIS ORDER IS FOR PROCUREMENT OF VARIOUS QUANTITIES OF SIMPLE KEY LOADERS FOR VARIOUS FOREIGN MILITARY CUSTOMERS
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  0046     W15P7T12D0019  
Tuesday, September 19, 2017
$0.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N00164: NSWC CRANE

C: DELIVERY ORDER
ENGINEERING SERVICES IGF::CT::IGF
K016: MODIFICATION OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES

  0002     N0016416GJQ18     N0016416RJQ18  
Tuesday, September 19, 2017
$0.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N00019: NAVAL AIR SYSTEMS COMMAND

B: IDC
ADDED THREE ADDITIONAL CLINS FOR SOCOM
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  N0001917D0009     N0001916R0064  
Tuesday, September 19, 2017
$81,341.28
9700: Department of Defense
2100: DEPT OF THE ARMY
W15P7T: W6QK ACC-APG

C: DELIVERY ORDER
THIS ORDER SUPPORTS VARIOUS QUANTITIES OF SIMPLE KEY LOADER UNITS FOR VARIOUS CUSTOMERS
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  0046     W15P7T12D0019  
Monday, September 18, 2017
$0.00
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92222: USSOCOM REGIONAL CONTRACTING OFFICE

B: IDC
MODI LOW/MID/HIGH SYSTEM
5865: ELECTRONIC COUNTERMEASURES, COUNTER-COUNTERMEASURES AND QUICK REACTION CAPABILITY EQUIPMENT

  H9222217D0023     H9222217R0001  
Monday, September 18, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8509: FA8509 AFLCMC WIUKA

D: DEFINITIVE CONTRACT
IGF::OT::IGF DEVELOPMENT, INSTALLATION AND TESTING OF THE AIRBORNE MISSION NETWORKING SYSTEM ON THE MC-130J AIRCRAFT
R425: SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL

  FA850917C0002     FA850917R0004  
Monday, September 18, 2017
$838,703.94
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92222: USSOCOM REGIONAL CONTRACTING OFFICE

C: DELIVERY ORDER
AMK ECP
5865: ELECTRONIC COUNTERMEASURES, COUNTER-COUNTERMEASURES AND QUICK REACTION CAPABILITY EQUIPMENT

  0001     H9222217D0023     H9222217R0001  
Monday, September 18, 2017
$0.00
9700: Department of Defense
2100: DEPT OF THE ARMY
W56KGY: W6QK ACC-APG

C: DELIVERY ORDER
THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE WIDE AREA WORK FLOW CLAUSE DFAR 252.232-7006.
5865: ELECTRONIC COUNTERMEASURES, COUNTER-COUNTERMEASURES AND QUICK REACTION CAPABILITY EQUIPMENT

  KZ04     W15QKN14D0041  
Friday, September 15, 2017
$779,000.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8750: FA8750 AFRL RIK

D: DEFINITIVE CONTRACT
IGF::OT::IGF RESEARCH AND DEVELOPMENT OF SAFETY OF NAVIGATION
AD93: R&D- DEFENSE OTHER: OTHER (ADVANCED DEVELOPMENT)

  FA875016C0210     FA875015R0001  
Friday, September 15, 2017
$988,227.00
9700: Department of Defense
97ZS: U.S. SPECIAL OPERATIONS COMMAND (USSOCOM)
H92222: USSOCOM REGIONAL CONTRACTING OFFICE

C: DELIVERY ORDER
YEAR 4 SUPPORT INCREMENTAL FUNDING
7030: INFORMATION TECHNOLOGY SOFTWARE

  0010     H9222214D0023  
Friday, September 15, 2017
$25,375,884.00
9700: Department of Defense
2100: DEPT OF THE ARMY
W15P7T: W6QK ACC-APG

C: DELIVERY ORDER
ACQUISITION ACTION TO PROCURE THE NEXT GENERATION LOAD DEVICE - MEDIUM ENGINEERING CHANGES AND DATA RIGHTS TO DESIGN, DEVELOP AND DELIVER THE FILL DEVICE DELIVERABLES.
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  0031     W15P7T12D0019  
Thursday, September 14, 2017
$22,051,924.00
7000: Department of Homeland Security
7014: U.S. CUSTOMS AND BORDER PROTECTION
70B02C: AIR AND MARINE CTR DIV

C: DELIVERY ORDER
MULTIROLE ENFORCEMENT AIRCRAFT
1510: AIRCRAFT, FIXED WING

  HSBP1017J00752     HSBP1016D00011  
Thursday, September 14, 2017
$701,950.12
9700: Department of Defense
1700: DEPT OF THE NAVY
N00421: NAVAL AIR WARFARE CENTER AIR DIV

C: DELIVERY ORDER
IGF::OT::IGF INCREMENTAL FUNDING
AC65: R&D- DEFENSE SYSTEM: ELECTRONICS/COMMUNICATION EQUIPMENT (OPERATIONAL SYSTEMS DEVELOPMENT)

  0009     N0042115G0001  
Thursday, September 14, 2017
$3,400,000.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80HQTR: NASA HEADQUARTERS

D: DEFINITIVE CONTRACT
IGF::OT::IGF NASA BAA/NRA AWARD. PROPOSAL TITLE "NEXT SPACE TECHNOLOGIES FOR EXPLORATION PARTNERSHIP - NEXTSTEP-2.
AR12: R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT)

  80HQTR17C0009     NNH15ZCQ001K  
Thursday, September 14, 2017
$0.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N00421: NAVAL AIR WARFARE CENTER AIR DIV

C: DELIVERY ORDER
IGF::OT::IGF POP EXTENSION
5999: MISCELLANEOUS ELECTRICAL AND ELECTRONIC COMPONENTS

  0001     N0042115G0001  
Thursday, September 14, 2017
$5,089,435.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::OT::IGF ACAT III BIG SAFARI
D318: IT AND TELECOM- INTEGRATED HARDWARE/SOFTWARE/SERVICES SOLUTIONS, PREDOMINANTLY SERVICES

  FA862017F4093     FA862016G3013  
Wednesday, September 13, 2017
$44,706.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N00421: NAVAL AIR WARFARE CENTER AIR DIV

B: PURCHASE ORDER
CIRCUIT CARD ASSEMB
5998: ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE

  N0042117P0742     N0042117Q0412  
Wednesday, September 13, 2017
$0.00
7000: Department of Homeland Security
7014: U.S. CUSTOMS AND BORDER PROTECTION
70B02C: AIR AND MARINE CTR DIV

B: IDC
MULTIROLE ENFORCEMENT AIRCRAFT (MEA)
1510: AIRCRAFT, FIXED WING

  HSBP1016D00011     HSBP1015R0055  
Tuesday, September 12, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::CT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  FA862017F4000     FA862016G3013  
Tuesday, September 12, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8750: FA8750 AFRL RIK

D: DEFINITIVE CONTRACT
IGF::OT::IGF BLUE MOON
AD92: R&D- DEFENSE OTHER: OTHER (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT)

  FA875016C0302     FA875015R0001  
Tuesday, September 12, 2017
$1,138,553.54
9700: Department of Defense
2100: DEPT OF THE ARMY
W911QX: W6QK ACC-APG ADELPHI

D: DEFINITIVE CONTRACT
IGF::OT::IGF V3/V4 INDUCTION SQUAWKS BILATERAL CHANGE ORDER
AC13: R&D- DEFENSE SYSTEM: AIRCRAFT (ADVANCED DEVELOPMENT)

  W911QX15C0012  
Monday, September 11, 2017
$63,513.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA3002: FA3002 338 SCONS CC

C: DELIVERY ORDER
IGF::OT::IGF A-29 PILOT&MAINTENANCE TRAINING FOR LEBANON AIR FORCE (LAF) AT MOODY AFB
U006: EDUCATION/TRAINING- VOCATIONAL/TECHNICAL

  0001     FA300217D0006     FA300216R0009  
Monday, September 11, 2017
$0.00
9700: Department of Defense
2100: DEPT OF THE ARMY
W15P7T: W6QK ACC-APG

C: DELIVERY ORDER
PERIOD OF PERFORMANCE (POP) EXTENSION TO THE LINE ITEM 5027AA FROM 11 SEPT 2017 TO 15 SEPT 2017
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  0031     W15P7T12D0019  
Monday, September 11, 2017
($5,000.00)
9700: Department of Defense
1700: DEPT OF THE NAVY
N00104: NAVSUP WEAPON SYSTEMS SUPPORT MECH

B: PURCHASE ORDER
NAVY REQUIREMENT
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  N0010417PXA82  
Friday, September 8, 2017
$7,405.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
ACAT III BIG SAFARI
1510: AIRCRAFT, FIXED WING

  0227     FA862011G4020  
Friday, September 8, 2017
($470,000.00)
9700: Department of Defense
1700: DEPT OF THE NAVY
N00164: NSWC CRANE

C: DELIVERY ORDER
ENGINEERING SERVICES IGF::CT::IGF
K016: MODIFICATION OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES

  0002     N0016416GJQ18     N0016416RJQ18  
Thursday, September 7, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

C: DELIVERY ORDER
IGF::OT::IGF ACAT III BIG SAFARI
R706: SUPPORT- MANAGEMENT: LOGISTICS SUPPORT

  0149     FA862011G4020  
Thursday, September 7, 2017
$0.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N00383: NAVSUP WEAPON SYSTEMS SUPPORT

C: DELIVERY ORDER
BEACON RCVR ASSY,AI
5826: RADIO NAVIGATION EQUIPMENT, AIRBORNE

  7020     N0038312G002D  
Wednesday, September 6, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA3002: FA3002 338 SCONS CC

B: IDC
IGF::OT::IGF A-29 PILOT&MAINTENANCE TRAINING FOR LEBANON AIR FORCE (LAF) AT MOODY AFB GA
U006: EDUCATION/TRAINING- VOCATIONAL/TECHNICAL

  FA300217D0006     FA300216R0009  
Wednesday, September 6, 2017
$877,154.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8630: FA8630 AFLCMC WFG

D: DEFINITIVE CONTRACT
EGYPT C-130 ELINT IGF::OT::IGF
J016: MAINT/REPAIR/REBUILD OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES

  FA863017C5012  
Wednesday, September 6, 2017
$0.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80JSC0: NASA JOHNSON SPACE CENTER

B: IDC
IGF::OT::IGFRESEARCH, ENGINEERING, AND MISSION INTEGRATION SERVICES (REMIS) THE SCOPE OF THE REMIS CONTRACT INCLUDES THE ABILITY TO SOLICIT SPACEFLIGHT AND GROUND HARDWARE AND SOFTWARE, SUSTAINING ENGINEERING FUNCTIONS, ENGINEERING SERVICES, PAYLOAD FACILITY INTEGRATION AND RESEARCH MISSION INTEGRATION AND OPERATIONS (MI&O) SERVICES REQUIRED BY THE ISS PROGRAM VIA CONTRACTS WITH MULTIPLE AWARDEES USING THEIR COMMERCIAL APPROACHES TO SATISFY THE SOW. OTHER NASA ORGANIZATIONS OR FEDERAL GOVERNMENT AGENCIES MAY UTILIZE THIS CONTRACT THROUGH A MUTUAL AGREEMENT WITH THE NASA ISS PROGRAM.
AR67: R&D- SPACE: STATION (COMMERCIALIZED)

  80JSC017D0018     NNJ17584385R  
Wednesday, September 6, 2017
$250,000.00
8000: National Aeronautics and Space Administration
8000: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
80JSC0: NASA JOHNSON SPACE CENTER

C: DELIVERY ORDER
IGF::OT::IGFRESEARCH, ENGINEERING, MISSION INTEGRATION SERVICES (REMIS)THE SCOPE OF THE REMIS CONTRACT INCLUDES THE ABILITY TO SOLICIT SPACEFLIGHT AND GROUND HARDWARE AND SOFTWARE, SUSTAINING ENGINEERING FUNCTIONS, ENGINEERING SERVICES, PAYLOAD FACILITY INTEGRATION AND RESEARCH MISSION INTEGRATION AND OPERATIONS (MI&O) SERVICES REQUIRED BY THE ISS PROGRAM VIA CONTRACTS WITH MULTIPLE AWARDEES USING THEIR COMMERCIAL APPROACHES TO SATISFY THE SOW. OTHER NASA ORGANIZATIONS OR FEDERAL GOVERNMENT AGENCIES MAY UTILIZE THIS CONTRACT THROUGH A MUTUAL AGREEMENT WITH THE NASA ISS PROGRAM.
AR67: R&D- SPACE: STATION (COMMERCIALIZED)

  80JSC017F0082     80JSC017D0018  
Wednesday, September 6, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8656: FA8656 LCMC OL PK RAC

C: DELIVERY ORDER
POP EXTENSION
1560: AIRFRAME STRUCTURAL COMPONENTS

  FA865617F1007     FA865616D0098  
Wednesday, September 6, 2017
$0.00
7000: Department of Homeland Security
7014: U.S. CUSTOMS AND BORDER PROTECTION
70B02C: AIR AND MARINE CTR DIV

B: IDC
MULTIROLE ENFORCEMENT AIRCRAFT - MOD P00004
1510: AIRCRAFT, FIXED WING

  HSBP1016D00011     HSBP1015R0055  
Wednesday, September 6, 2017
$1,412,071.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8509: FA8509 AFLCMC WIUKA

D: DEFINITIVE CONTRACT
IGF::OT::IGF CONTRACTOR LOGISTIRS SUPPORT FOL PRECISION STRIKE PACKAGE (PSP)
R408: SUPPORT- PROFESSIONAL: PROGRAM MANAGEMENT/SUPPORT

  FA850916C0003  
Wednesday, September 6, 2017
$0.00
9700: Department of Defense
1700: DEPT OF THE NAVY
N00421: NAVAL AIR WARFARE CENTER AIR DIV

B: IDC
LIMITED PRODUCTION SYSTEMS
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  N0042117D0047     N0042116R0040  
Thursday, August 31, 2017
($12,756.00)
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8656: FA8656 LCMC OL PK RAC

D: DEFINITIVE CONTRACT
DEOBLIGATION
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  FA865615C0300  
Thursday, August 31, 2017
$0.00
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8620: FA8620 AFLCMC WI

B: IDC
ACAT III BIG SAFARI
5963: ELECTRONIC MODULES

  FA862015D4011  
Thursday, August 31, 2017
$0.00
9700: Department of Defense
2100: DEPT OF THE ARMY
W15P7T: W6QK ACC-APG

C: DELIVERY ORDER
PERIOD OF PERFORMANCE EXTENSION TO THE LINE ITEM 5027AA FROM 31 AUG 2017 TO 11 SEPT 2017
5810: COMMUNICATIONS SECURITY EQUIPMENT AND COMPONENTS

  0031     W15P7T12D0019  
Thursday, August 31, 2017
($11,282.32)
9700: Department of Defense
5700: DEPT OF THE AIR FORCE
FA8656: FA8656 LCMC OL PK RAC

C: DELIVERY ORDER
DEOBLIGATION
1680: MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

  0022     FA867712D0089  

National Stock Numbers Related To CAGE 8X691

  FSG    FSC    NSN    Part Number    Name  
  58    5895  5895-01-628-2081  121280-001    GENERATOR,INTERFERENCE  

  Alternate References: , 016282081  
  59    5995  5995-01-575-9967  AIR-G01    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 015759967  
  59    5995  5995-01-575-9969  AIR-G03    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 015759969  
  59    5995  5995-01-575-9968  AIR-G02    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 015759968  
  59    5975  5975-01-643-8635  00603000-04D    DRAWER,ELECTRICAL EQUIPMENT  

  Alternate References: , 016438635  
  58    5895  5895-01-643-7956  00860500-01    AIR TRAFFIC CONTROL GROUP,MOBILE  

  Alternate References: , 016437956  
  59    5985  5985-01-614-1441  00423050-01    PEDESTAL,ANTENNA  

  Alternate References: , 016141441  
  58    5895  5895-01-544-3087  00603510-02    PROCESSOR,COMMUNICA  

  Alternate References: , 015443087  
  59    5995  5995-01-544-2991  00600160-100    CABLE ASSEMBLY,SPECIAL  

  Alternate References: , 015442991  
  58    5895  5895-01-544-3093  00603530-02    VDB INTERFACE  

  Alternate References: , 015443093  
  58    5895  5895-01-544-3074  00601050-04    COMPUTER SYSTEM,DIG  

  Alternate References: , 015443074  
  51    5120  5120-01-487-4073  00181003-01    TOOL KIT,REMOTE LANDING SITE TOWER  

  Alternate References: , 014874073  
  51    5120  5120-01-499-9246  00346950-01    ADAPTER,TORQUE WRENCH  

  Alternate References: , 014999246  
  59    5998  5998-01-523-2477  00345825-01    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 015232477  
  59    5995  5995-01-518-8047  00603860-05    CABLE ASSEMBLY,POWER  

  Alternate References: , 015188047  
  70    7010  7010-01-518-8007  00601050-01    COMPUTER SYSTEM,DIG  

  Alternate References: , 015188007  
  58    5895  5895-01-614-1928  00422000-11    LANDING CONTROL SUBSYSTEM  

  Alternate References: , 016141928  
  59    5985  5985-01-651-1964  00862141-01    ANTENNA ASSEMBLY  

  Alternate References: , 016511964  
  59    5995  5995-01-518-8040  00603860-03    CABLE ASSEMBLY,POWER  

  Alternate References: , 015188040  
  93    9340  9340-01-653-7223  00861200-01    GLASS,LAMINATED  

  Alternate References: , 016537223  
  70    7010  7010-01-618-9910  01271000-02    COMPUTER SYSTEM,DIGITAL  

  Alternate References: , 016189910  
  58    5895  5895-01-628-2060  121038-001    AMPLIFIER-POWER SUPPLY  

  Alternate References: , 016282060  
  59    5995  5995-01-518-8041  00603850-01    CABLE ASSEMBLY,SPECIAL  

  Alternate References: , 015188041  
  59    5995  5995-01-518-8050  00603910-01    CABLE ASSEMBLY,SPECIAL  

  Alternate References: , 015188050  
  59    5998  5998-01-518-8029  00603540-01    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 015188029  
  58    5895  5895-01-688-4438  00403565-01    ENCODER-DECODER,COMMUNICATIONS EQUIPMENT  

  Alternate References: , 016884438  
  84    8465  8465-01-696-8062  16000A1000-0    FIELD PACK  

  Alternate References: , 016968062  
  59    5998  5998-01-477-4445  00172300-I    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 014774445  
  59    5998  5998-01-689-9793  02694003-100-001    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 016899793  
  59    5995  5995-01-604-6141  116920-001    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 016046141  
  59    5995  5995-01-604-6103  119738-180    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 016046103  
  58    5895  5895-01-628-2151  121202-001    GENERATOR,INTERFERENCE  

  Alternate References: , 016282151  
  58    5895  5895-01-628-2162  121201-001    GENERATOR,INTERFERENCE  

  Alternate References: , 016282162  
  58    5895  5895-01-668-2268  01510050-01    MISSION EQUIPMENT PACKAGE,GROUND COMMAND AND CONTROL SYSTEM  

  Alternate References: , 016682268  
  58    5895  5895-01-603-0708  00603535-02    PROCESSOR,COMMUNICATIONS  

  Alternate References: , 016030708  
  70    7025  7025-01-599-0906  00473410-01    NRP,DISPLAY,LCD,19I  

  Alternate References: , 015990906  
  59    5998  5998-01-570-9026  00472800-01    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 015709026  
  59    5995  5995-01-224-8698  16-20001-02    CABLE ASSEMBLY,RADIO FREQUENCY  

  Alternate References: , 012248698  
  59    5999  5999-01-468-4527  00132356    HEAT SINK,ELECTRICAL-ELECTRONIC COMPONENT  

  Alternate References: , 014684527  
  59    5998  5998-01-468-8036  00132550    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 014688036  
  61    6145  6145-01-483-9414  W20752    CABLE,POWER,ELECTRICAL  

  Alternate References: , 014839414  
  53    5340  5340-01-485-7246  00182001-03    PLATE,MOUNTING  

  Alternate References: , 014857246  
  59    5920  5920-01-485-6415  LPC10267-6    ARRESTER,ELECTRICAL SURGE  

  Alternate References: , 014856415  
  59    5925  5925-01-486-4114  IULNK1-1-52-70.0-K    CIRCUIT BREAKER  

  Alternate References: , 014864114  
  53    5340  5340-01-486-8231  00186101-01    PLATE,MOUNTING  

  Alternate References: , 014868231  
  59    5995  5995-01-487-0780  16-16012    CABLE ASSEMBLY,RADIO FREQUENCY  

  Alternate References: , 014870780  
  59    5950  5950-01-454-0987  22-00005-02    TRANSFORMER,POWER  

  Alternate References: , 014540987  
  61    6130  6130-01-454-2779  27-20003-01    POWER SUPPLY  

  Alternate References: , 014542779  
  53    5340  5340-01-468-3266  00132129-2    BRACKET MOUNTING  

  Alternate References: , 014683266  
  53    5340  5340-01-468-5910  00132112    SLIDE,DRAWER,EXTENSION  

  Alternate References: , 014685910  
  59    5998  5998-01-468-6052  FAB-00132518    PRINTED CIRCUIT BOARD  

  Alternate References: , 014686052  
  59    5999  5999-01-466-0855  811760    HEAT SINK,ELECTRICAL-ELECTRONIC COMPONENT  

  Alternate References: , 014660855  
  59    5999  5999-01-468-4871  00132532    SHIELDING GASKET,ELECTRONIC  

  Alternate References: , 014684871  
  59    5905  5905-01-468-3447  02-00001-2    RESISTOR,FIXED,FILM  

  Alternate References: , 014683447  
  59    5950  5950-01-468-7639  03-00006-1    SHIELDING BEAD,ELECTRONIC  

  Alternate References: , 014687639  
  59    5910  5910-01-472-7553  MLP821M250EB1A    CAPACITOR,FIXED,ELECTROLYTIC  

  Alternate References: , 014727553  
  53    5340  5340-01-487-3865  00184106    BRACKET,MOUNTING  

  Alternate References: , 014873865  
  53    5340  5340-01-503-2474  00343016-02    STANDOFF,THREADED,SPACING  

  Alternate References: , 015032474  
  61    6145  6145-01-518-7978  00600140-02    CABLE,RADIO FREQUEN  

  Alternate References: , 015187978  
  59    5935  5935-01-468-5797  11-01035    CONNECTOR,PLUG,ELECTRICAL  

  Alternate References: , 014685797  
  59    5925  5925-01-454-7643  10-06000-06    CIRCUIT BREAKER  

  Alternate References: , 014547643  
  59    5935  5935-01-414-9828  2440-6122TB    CONNECTOR,RECEPTACLE,ELECTRICAL  

  Alternate References: , 014149828  
  61    6145  6145-01-468-5364  16-19005    CABLE,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 014685364  
  59    5985  5985-01-652-7236  SCR9-2400    REFLECTOR,ANTENNA  

  Alternate References: , 016527236  
  53    5340  5340-01-679-8108  1057371    GUARD RAIL SECTION,UTILITY  

  Alternate References: , 016798108  
  53    5340  5340-01-679-8044  1057370    GUARD RAIL SECTION,UTILITY  

  Alternate References: , 016798044  
  53    5340  5340-01-678-6556  07-0001360-001    BRACKET,ANGLE  

  Alternate References: , 016786556  
  59    5985  5985-01-678-8368  1057421    ADAPTER,ANTENNA TO ANTENNA BASE  

  Alternate References: , 016788368  
  53    5340  5340-01-502-9035  00347051-01    STANDOFF,THREADED,SPACING  

  Alternate References: , 015029035  
  53    5340  5340-01-678-6560  07-0011788-001    BRACKET,ANGLE  

  Alternate References: , 016786560  
  53    5340  5340-01-678-6735  64-0012502    DOOR,ACCESS,UTILITY  

  Alternate References: , 016786735  
  59    5930  5930-01-503-1487  00343070    SWITCH,CODE INDICATING WHEEL  

  Alternate References: , 015031487  
  59    5999  5999-01-554-4504  00470271-01    SHIELDING GASKET,ELECTRONIC  

  Alternate References: , 015544504  
  59    5985  5985-01-653-1462  00862181-01    BASE,ANTENNA SUPPORT  

  Alternate References: , 016531462  
  53    5340  5340-01-678-6598  64-0012500    DOOR,ACCESS,UTILITY  

  Alternate References: , 016786598  
  53    5330  5330-01-674-8548  PL-00401010-08 REV A ITEM 28    GASKET  

  Alternate References: , 016748548  
  59    5985  5985-01-678-7504  1057394-101    BASE,ANTENNA SUPPORT  

  Alternate References: , 016787504  
  59    5998  5998-01-514-3482  00172320-28    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 015143482  
  53    5340  5340-01-678-5763  64-0003038    COVER,ACCESS  

  Alternate References: , 016785763  
  59    5985  5985-01-670-2398  3574AS521-1    ATTENUATOR SET  

  Alternate References: , 016702398  
  59    5935  5935-01-678-3266  1057709-105    CONNECTOR ASSEMBLY,ELECTRICAL  

  Alternate References: , 016783266  
  41    4140  4140-01-259-5825  00343020-01    FAN,TUBEAXIAL  

  Alternate References: , 012595825  
  59    5985  5985-01-623-1677  131400-1    ANTENNA PEDESTAL SUBASSEMBLY  

  Alternate References: , 016231677  
  59    5970  5970-00-841-1172  RL6000SB-RED    TAPE,INSULATION,ELECTRICAL  

  Alternate References: , 008411172  
  58    5895  5895-01-563-0665  00404100-02    TRANSPONDER,AS,AIRC  

  Alternate References: , 015630665  
  59    5998  5998-01-478-8460  00131130    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 014788460  
  59    5998  5998-01-478-8476  00132541    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 014788476  
  59    5998  5998-01-478-7907  00132170    CIRCUIT CARD ASSEMBLY  

  Alternate References: , 014787907  
  59    5996  5996-01-527-7579  00343150-01    AMPLIFIER,RADIO FREQUENCY  

  Alternate References: , 015277579  
  61    6130  6130-01-478-8473  00132540    POWER SUPPLY  

  Alternate References: , 014788473  
  59    5985  5985-01-478-8103  00132120    DUMMY LOAD,ELECTRICAL  

  Alternate References: , 014788103  
  61    6110  6110-01-410-3434  724759-801    DISTRIBUTION BOX  

  Alternate References: , 014103434  
  59    5995  5995-01-270-8964  00184008-09    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 012708964  
  59    5975  5975-01-270-8980  RLN-4008B    BACKSHELL,ELECTRICAL CONNECTOR  

  Alternate References: , 012708980  
  59    5940  5940-01-468-9628  21-44007    TERMINAL,LUG  

  Alternate References: , 014689628  
  58    5895  5895-01-486-5129  LM25393-3    CENTRAL,COMMUNICATIONS  

  Alternate References: , 014865129  
  59    5995  5995-01-633-7000  00862156-01    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 016337000  
  53    5365  5365-01-652-9930  00862184-01    SPACER,SLEEVE  

  Alternate References: , 016529930  
  59    5995  5995-01-633-6476  1057618    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL  

  Alternate References: , 016336476  
  61    6150  6150-01-678-2181  30-0002999    CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL,BRANCHED  

  Alternate References: , 016782181